Completing projects up to $30 million dollars, Jordan Pile Driving has the capability to tackle any project, no matter the size. We have driven piles in every county in the state of Alabama. Jordan Pile Driving has driven from 8” pipe piles to as large as 66” cylinder piles and drove the longest concrete pile on the Gulf Coast at 175’ long.
More Projects
2013
2012
2011
2010
2009
2008
2007
2013
2013 ALDOT, Robertsdale, AL. (Racon)
Drove 867 pcs. of 16”, 20” and 30” sq. prestress piles for 5 new dual lane bridges on the Foley Beach Expressway Extension
2013 Plains Marketing, Mobile, AL.
Drove 24” sq. prestress piles and poured concrete caps for 2 ea. 100 MT ship breasting dolphin structures
2013 Chevron Refinery, Pascagoula, MS.
Drove 97 pcs. of 12.75” x 100’ pipe piles for a tank foundation.
2012
2012 Jackson County Maritime Training Center, Pascagoula, MS.
Drove 1,098 pcs. of 12” sq. prestress piles for a new building foundation. (Ben M. Radcliff Contractor)
2012 CSX Railroad, Hurricane, AL.
Drove 28 pcs. of 30” dia. pipe piles and replaced entire bridge crossing Little Briar Creek
2012 Lapp’s Grocery and Grill, Mobile, AL.
Installed 169 – 16” dia. auger cast piles and 76 pcs. of timber piles. (Case Construction)
2012 Chevron Refinery, Pascagoula, MS.
Drove 348 pcs. of 12.75” dia. pipe piles and 85 pcs. of 14” dia. pipe piles for HVC foundations
2012 Lenzing Fibers, Axis, AL.
Installed 10 – 24” dia. auger cast piles for a stack foundation. (G.A. West)
2012 Boise Papermill, Jackson, AL.
Installed 6 – 36” dia. auger cast piles for a pipe bridge foundation. (G.A. West )
2011
2011 Gulf Shores Dry Dock Basin, Gulf Shores, AL.
Drove 989 wall feet of AZ19-700 sheet piles and installed 16” and 18” sq. prestress piles for the 60 ton travel lift piers. (White-Spunner Construction)
2011 CSX Railroad, Evergreen, AL.
Drove 12 pcs. of 30” dia. pipe piles and replaced the entire bridge crossing Unnamed Creek
2010
2010 Mississippi Power, Gulfport, MS.
Drove 1,070 wall feet of AZ19-700 sheet piles and installed tie rods for the barge unloader dock.
2010 ALDOT, Mobile, AL.
Drove 375 wall feet of PZ 35 sheet piles for slide correction project on SR 158. (J.S. Walton Construction)
2010 Perdido Pass, Orange Beach, AL.
Drove 29 pcs. of 42” dia. pipe piles, 9 pcs. of HP 14 x 73 and 40 wall feet of AZ 14-700 for oil spill protection project. (Thompson Engineering)
2010 Millard Refrigeration, Mobile, AL.
Installed 250 – 24” dia. auger cast piles for tank foundation. (Esfeller Construction)
2009
2009 CSX Railroad, Mobile, AL.
Drove 46 pcs. of 24” dia. pipe piles and replaced the entire bridge crossing Catfish Bayou in the Mobile Delta
2009 Thyssen Krupp USA, Mobile, AL.
Drove 196 pcs. of 24” sq. and 147 pcs. of 18” sq. prestress piles for the dock facility. (Scott Bridge Company)
2009 Synergy, Mobile, AL.
Drove 300 wall feet of SCZ 21 sheet piles. (G.A. West and Company)
2008
2008 CSX Railroad, Mobile, AL.
Repair fender system damage to 14 mile bridge crossing Mobile River.
2008 Chevron Refinery, Pascagoula, MS.
Drove 547 pcs. of 20” dia. and 12.75” dia. pipe piles. (Canfer Construction Co.)
2008 Williams Energy, Coden, AL.
Drove 12.75” dia. pipe piles and AZ18 sheet piles. (InfraSource Underground Const. Co.)
2008 ALDOT Hillcrest Rd. Bridge
Drove 30″ sq. prestress piles for new bridge on Hillcrest Rd. (Newell Bush Construction)
2007
2007 NGSS Ship Systems, Pascagoula, MS.
Drove 12.75” dia. pipe piles and 16” sq. prestress piles for IPD and Machine Shops. (Ben M. Radcliff Contractor)
2007 NGSS Ship Systems, Pascagoula, MS.
Drove 16” sq. prestress piles for new propulsion shop. (Ben M. Radcliff Contractor)